Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Registration under "Shops & Establishment Act" | 15 Days | 514 | 484 | 345 | 139 | 12 Day(s) | 48 Application(s) in 2 Day(s) |
1 Day(s) | 269 Day(s) |
( 13 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
2 | Renewal under "Shops and Establishment Act" | 20 Days | 2401 | 2266 | 2121 | 145 | 12 Day(s) | 252 Application(s) in 2 Day(s) |
1 Day(s) | 449 Day(s) |
( 35 ) ( 1 ) ( 0 ) ( 0 ) ( 3 ) |
|
3 | Registration / Renewal under "The Building and Other Construction Workers (Regulation of Employment Conditions of Service Act), 1996" | 20 Days | 443 | 337 | 189 | 148 | 51 Day(s) | - | 1 Day(s) | 337 Day(s) |
( 2 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
4 | Registration Certificate of "Establishment Inter State Migrant Workmen (RE&CS) Act, 1979 (License of Contractor Establishment)" | 20 Days | 15 | 12 | 1 | 11 | 1 Day(s) | - | 1 Day(s) | 1 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
5 | Renewal Certificate of "Establishment Inter State Migrant Workmen (RE&CS) Act, 1979 (License of Contractor Establishment)" | 20 Days | 11 | 7 | 1 | 6 | 1 Day(s) | - | 1 Day(s) | 1 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
6 | Registration / Renewal of principal employer's establishment under provision of The Contracts Labour (Regulation and Abolition) Act, 1970 | 20 Days | 1267 | 1059 | 799 | 260 | 30 Day(s) | 90 Application(s) in 15 Day(s) |
1 Day(s) | 172 Day(s) |
( 12 ) ( 0 ) ( 6 ) ( 0 ) ( 4 ) |
|
7 | License for Contractors under provision of The Contracts Labour (R & A) Act,1970 | 20 Days | 632 | 556 | 365 | 191 | 28 Day(s) | - | 1 Day(s) | 145 Day(s) |
( 2 ) ( 2 ) ( 0 ) ( 0 ) ( 0 ) |
|
8 | Renewal License for Contractors under provision of The Contracts Labour (R & A) Act,1970 | 20 Days | 2376 | 2050 | 1558 | 492 | 28 Day(s) | 227 Application(s) in 20 Day(s) |
1 Day(s) | 257 Day(s) |
( 14 ) ( 1 ) ( 0 ) ( 0 ) ( 3 ) |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Fee Incurred to Grant Approval / Certificate | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Incentives under Investment Promotion Scheme - 2015 for Textile Sector | 30 Days | 34 | 31 | 23 | 8 | 22 | 27 | 37 Day(s) | 427 Day(s) | Not Applicable |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
2 | Incentives under Investment Promotion Scheme - 2015 for MSME | 30 Days | 527 | 393 | 355 | 38 | 25 | 29 | 8 Day(s) | 486 Day(s) | Not Applicable |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
3 | Investment Promotion Scheme : 2022 to 2027 (20 May 2022 to 19 May 2027) | 30 Days | 549 | 13 | 0 | 13 | - | - | - | - | Not Applicable |
( 0 ) ( 0 ) ( 1 ) ( 0 ) ( 0 ) |
|
4 | Allotment of land in Industrial Area | 30 Days | 1 | 1 | 0 | 1 | 25 | 25 | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
||
5 | Application for the grant of a licence to Manufacturing, Blending, Packing of Re-Refining of Lubricating Oil or Grease | 30 Days | 0 | 0 | 0 | 0 | - | - | - | - | - |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Registration of license under The Factories Act, 1948 | 20 Days | 427 | 413 | 383 | 30 | 25 Day(s) | 27 Application(s) in 17 Day(s) |
3 Day(s) | 310 Day(s) |
( 8 ) ( 1 ) ( 1 ) ( 0 ) ( 0 ) |
|
2 | Renewal of license under The Factories Act, 1948 | 60 Days | 2075 | 1660 | 1550 | 110 | 37 Day(s) | 68 Application(s) in 23 Day(s) |
4 Day(s) | 127 Day(s) |
( 12 ) ( 2 ) ( 1 ) ( 0 ) ( 0 ) |
|
3 | Approval of plan and permission to construct/extend/or take into use any building as a factory under the Factories Act, 1948 | 15 Days | 13 | 5 | 1 | 4 | 2 Day(s) | - | 2 Day(s) | 2 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
4 | Registration of Boilers under The Boilers Act, 1923 | 30 Days | 27 | 13 | 9 | 4 | 58 Day(s) | - | 1 Day(s) | 143 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
5 | Renewal of Boilers under The Boilers Act, 1923 | 15 Days | 335 | 284 | 273 | 11 | 36 Day(s) | - | 2 Day(s) | 127 Day(s) |
( 7 ) ( 2 ) ( 0 ) ( 0 ) ( 0 ) |
|
6 | Registration / Renewal of Boilers Manufactures under The Boilers Act, 1923 | 15 Days | 2 | 2 | 1 | 1 | 1 Day(s) | - | 1 Day(s) | 1 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | Mobile Tower Approval | - | 7 Days | - | - | - | - | 5 Day(s) | 6 Day(s) | - | - |
2 | Trade Licenses | 7 Days | 587 | 587 | 183 | 404 | 6 Day(s) | 7 Day(s) | - | - |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | NA Application Form / Change in Land Use | 90 Days | 163 | 17 | 9 | 8 | 152 Day(s) | - | 93 Day(s) | 202 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
2 |
Application of Licenses under rule 11 of the Dadra and Nagar Haveli & Daman and Diu Cinema (Regulation of Exibition by Video.) Rules, 1985 / Application for registration under Cinema Regulation for Cinema Halls.
(Registration and Renewal) |
45 Days | 0 | 0 | 0 | 0 | - | - | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
3 | Film Shooting Permission(s) Form | 5 Days | 1 | 0 | 0 | 0 | - | - | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
4 | Society Registration | 5 Days | 3 | 1 | 1 | 0 | 1 Day(s) | 1 Application(s) in 1 Day(s) |
1 Day(s) | 1 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
5 | Approval for DG set installation | - | 5 Days | 0 | 0 | 0 | 0 | - | - | - | - |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Registration under "Weights & Measure" | 30 Days | 21 | 17 | 12 | 5 | 18 Day(s) | 1 Application(s) in 14 Day(s) |
6 Day(s) | 33 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 1 ) |
|
2 | Registration under "License for Repairer" | 30 Days | 0 | 0 | 0 | 0 | - | - | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
3 | Renewal under "License for Repairer" | 30 Days | 9 | 7 | 3 | 4 | 11 Day(s) | 2 Application(s) in 10 Day(s) |
10 Day(s) | 13 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
4 | Registration under "License for Dealer" | 30 Days | 1 | 1 | 1 | 0 | 44 Day(s) | 1 Application(s) in 44 Day(s) |
44 Day(s) | 44 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
5 | Renewal under "License for Dealer" | 30 Days | 6 | 5 | 4 | 1 | 12 Day(s) | 2 Application(s) in 10 Day(s) |
10 Day(s) | 13 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
6 | Registration under "License for Manufacturer" | 30 Days | 1 | 1 | 0 | 1 | - | - | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
7 | Renewal under "License for Manufacturer" | 30 Days | 5 | 5 | 3 | 2 | 14 Day(s) | - | 12 Day(s) | 16 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
8 | Registration under "Verification and Stamping of Weights & Measures" | 5 Days at Office & 7 Days at Applicant Premises | 366 | 366 | 366 | 0 | 3 | 3 | - | - |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval |
---|---|---|---|---|---|---|---|---|---|---|---|
1 |
Issue of New Electricity Connection
a) Temporary connection |
- | 15 Days | 10 | 10 | 6 | 4 | 4 | 3 Application in 5 Days |
- | - |
2 |
Issue of New Electricity Connection
b) LT connection |
- | 45 Days | 122 | 122 | 102 | 20 | 8 | 12 Application in 11 Days |
- | - |
3 |
Issue of New Electricity Connection
c) HT connection |
- | 45 Days | 13 | 13 | 13 | 0 | 4 | 2 Application in 8 Days |
- | - |
4 | Approval for DG set installation (Registration and Renewal) | - | 15 Days | 16 | 16 | 16 | 0 | 10 | 3 Application in 15 Days | - | - |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Water Connection or Certificate of Non-Availability of Water | 07 Days | 14 | 4 | 1 | 3 | 5 Days | 2 Application in 7 Days |
1 Day(s) | 1 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Hotel Registration Form | 21 Days | 8 | 2 | 2 | 0 | 1 Day(s) | - | 1 Day(s) | 1 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
2 | Hotel Registration Form - Renewal | 21 Days | 33 | 27 | 17 | 10 | 16 Day(s) | 5 Application(s) in 1 Day(s) |
1 Day(s) | 87 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
3 | Travel Agency Registration Form | 21 Days | 48 | 10 | 0 | 10 | - | - | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
4 | Travel Agency Form - Renewal | 21 Days | 3 | 2 | 0 | 2 | - | - | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
5 | Tourism Event - Performance License | 21 Days | 0 | 0 | 0 | 0 | - | - | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Partnership Firms Registration | 15 Days | 78 | 53 | 51 | 2 | 38 Day(s) | 4 Application(s) in 20 Day(s) |
6 Day(s) | 128 Day(s) |
( 1 ) ( 0 ) ( 0 ) ( 0 ) ( 1 ) |
|
2 | Property Registration | Same Day | 5759 | 4931 | 4915 | 16 | Same Day | |||||
3 | Nil Certificate for Encumbrance | 30 Day | 416 | 416 | 416 | 0 | 25 Day(s) | - | - | - |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Construction Permission / Building Plan Approval | 21 Days | 10 | 2 | 1 | 1 | 89 Day(s) | 1 Application(s) in 89 Day(s) |
89 Day(s) | 89 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
2 | Occupancy Certificate / Part Occupancy Certificate | 30 Days | 77 | 31 | 29 | 2 | 135 Day(s) | - | 27 Day(s) | 381 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
|
3 | Application for Inspection at Plinth level | 15 Days | 4 | 4 | 3 | 1 | 53 Day(s) | 1 Application(s) in 48 Day(s) |
46 Day(s) | 63 Day(s) |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | Label Registration/Brand Registration | - | 10 Days | 0 | 0 | 0 | 0 | - | - | - | - |
2 | Export Permit (spirit) by Distilleries/Industries | - | 3 Days | 0 | 0 | 0 | 0 | - | - | - | - |
3 | Export Permits(IMFL/CL/Beer/FL) by Distilleries/Brewery | - | 3 Days | 0 | 0 | 0 | 0 | - | - | - | - |
4 | Import Permit (spirit) by Distilleries/Industries | - | 3 Days | 0 | 0 | 0 | 0 | - | - | - | - |
5 | Import Permits(IMFL/CL/Beer/FL) by Wholesalers | - | 3 Days | 0 | 0 | 0 | 0 | - | - | - | - |
6 | Local Sale/Transport Permits(Spirit) by Distilleries/Industries) | - | 1 Days | 0 | 0 | 0 | 0 | - | - | - | - |
7 | Local Sale Permits(IMFL/CL/Beer/FL) by Distilleries/Brewery/Wholesalers | - | 1 Days | 0 | 0 | 0 | 0 | - | - | - | - |
8 | Occasional License | - | 7 Days | 0 | 0 | 0 | 0 | - | - | - | - |
9 | Renewal of Licenses(Distilleries/Brewery/Wholesalers/Retailers/Hotels) | - | 30 Days | 0 | 0 | 0 | 0 | - | - | - | - |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval | Rating & Feedback |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Tree Cutting Permission | 30 Days | 0 | 0 | 0 | 0 | - | - | - | - |
( 0 ) ( 0 ) ( 0 ) ( 0 ) ( 0 ) |
Sr. No. | Name of Service | Average Fee |
Time Limit Prescribed as per the Public Service Guarantee Act or Equivalent Act |
Total Number of Applications Received | Total Number of Applications Processed | Total Number of Applications Approved | Total Number of Applications Rejected | Average Time Taken To Grant Approval | Median Time Taken to Grant Approval | Minimum Time To Grant Approval | Maximum Time To Grant Approval |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | Retail Drug License (Pharmacy) (Registration and Renewal) | - | 30 Days | 55 | 55 | 55 | 0 | 29 | 28 | - | - |
2 | Wholesale Drug License (Registration and Renewal) | - | 30 Days | 24 | 24 | 20 | 4 | 27 | 29 | - | - |
3 | Drug Manufacturing License (registration and Renewal) | - | 45 Days | 18 | 18 | 18 | 0 | 41 | 43 | - | - |