On the basis of recommendation made by the DIPP, Government of India and Information provided by the concern departments regarding Time lines and Competent Authority for necessary Clearances/NOCs/Permissions/Renewals, Single Window Agency hereby notifies the following Services, the time frames within which these are to be provided to the citizens, Competent Authority and deemed approval authority as per schedule given below:
Planning & Development Authority - Daman
Sr. No. Name of Service Apply Link Department Name Timeline
(Working Days)
Fees / Procedure / Checklist Designation of the Authority Responsible to Deliver the Services 1st Appellate Authority for Grievance Redressal 2nd Appellate Authority for Grievance Redressal
1 Construction Permission (Include Storage of Construction Material) Click Here Planning & Development Authority - Daman 21 Days View Member Secretary (PDA). Chairman (PDA) -
2 Occupancy Certificate / Part Occupancy Certificate Click Here Planning & Development Authority -Daman 30 Days View Member Secretary (PDA). Chairman (PDA) -
3 Application for Inspection at Plinth level Click Here Planning & Development Authority -Daman 15 Days View Member Secretary (PDA). Chairman (PDA) -
Sr. No. Reforms Related to Ease of Doing Business ( EODB ) Document / URL
1 Uniform building code/building by-law (Development Control Rules)
2 Risk-Based Classification of Buildings
3 Responsibilities for professionals including architects and engineers engaged in the construction process
4 Mandatory qualifications for architects and structural engineers
5 master plans/zonal plans/land use plans for all urban areas
(Regional Plan for Daman District)
6 Inspection procedure and checklist for contruction permission
7 Inspection procedure and checklist for occupancy certificate
8 Order Regarding inspection for various services shall be limitated to the checklist
9 Computerized allocation of inspectors
10 Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process
(Order regarding submition of the inspection reports with the timeline on department website)
11 Fees, procedure and all list of documents that need to be provided are available on the website
(Order regarding charges for stacking of buliding matrial on public road and with site)
12 Legislation for approval of complete application
(This Processes merged with various services provide by PDA)
13 Single window system and mandate the following features without the requirement of physical visit
(This Processes merged with various services provide by PDA)
14 Valid master plans/zonal plans/land use plans for all urban and Panchayat areas
Planning & Development Authority - DNH
Sr. No. Reforms Related to Ease of Doing Business ( EODB ) Document / URL
1 Online dashboard available in public domain which is updated regularly
2 Implement a GIS system to provide details about the land earmarked for industrial
3 GIS system provides details about available connectivity infrastructure
4 Uniform building code/building by-law applicable to the entire State
5 Uniform building code/building by-law include provisions for risk-based classification of buildings
6 Uniform building code/building by-law includes accreditation programs and clear responsibilities for professionals including architects and engineers
7 Qualifications for architects and structural engineers in the uniform building by-law applicable in State/UT
8 Master plans/zonal plans/land use plans for all urban areas
9 Stipulate that construction permits are provided within 45 days
10 Fees, procedure and a comprehensive list of documents including pre-construction and post-construction No Objection Certificates (NOCs), registrations and other mandatory State/UT approvals
11 Construction permit approval
12 Mandate a single, joint site inspection of Fire, Sewerage, Electricity
13 Checklist and Procedure for Construction Permit,
Checklist and Procedure for Grant Occupancy Certificate
14
15 Mandate that inspections (except in case of complaint-based inspections) shall be limited to the checklist
16 Risk Assessment of various Services of PDA
17 Allocation of inspectors
18 Mandate Online Submission of Inspection Report
19 F`ees, procedure and a comprehensive list of all documents of Sanction for storage of construction material