Planning & Development Authority

On the basis of recommendation made by the DIPP, Government of India and Information provided by the concern departments regarding Time lines and Competent Authority for necessary Clearances/NOCs/Permissions/Renewals, Single Window Agency hereby notifies the following Services, the time frames within which these are to be provided to the citizens, Competent Authority and deemed approval authority as per schedule given below:
Planning & Development Authority - Daman
Sr. No. Name of Service Apply Link Department Name Timeline
(Working Days)
Fees / Procedure / Checklist Designation of the Authority Responsible to Deliver the Services 1st Appellate Authority for Grievance Redressal 2nd Appellate Authority for Grievance Redressal
1 Construction Permission (Include Storage of Construction Material) Click Here Planning & Development Authority -Daman 25 Days View Member Secretary (PDA). Chairman (PDA) -
2 Occupancy Certificate / Part Occupancy Certificate Click Here Planning & Development Authority -Daman 8 Days View Member Secretary (PDA). Chairman (PDA) -
3 Application for Inspection at Plinth level Click Here Planning & Development Authority -Daman 7 Days View Member Secretary (PDA). Chairman (PDA) -
4 Site Elevation Click Here Planning & Development Authority -Daman 10 Days View Member Secretary (PDA). Chairman (PDA) -
5 Zone Information Click Here Planning & Development Authority -Daman 7 Days View Member Secretary (PDA). Chairman (PDA) -
Sr. No. SRAP-2020 Reforms SRAP-2020 Reform No. Action
1 Uniform building code/building by-law (Development Control Rules) 178
2 Risk-Based Classification of Buildings 179
3 Responsibilities for professionals including architects and engineers engaged in the construction process 180
4 Mandatory qualifications for architects and structural engineers 181
5 master plans/zonal plans/land use plans for all urban areas
(Regional Plan for Daman District)
182
6 Inspection procedure and checklist for contruction permission 189
7 Inspection procedure and checklist for occupancy certificate 190
8 Order Regarding inspection for various services shall be limitated to the checklist 191
9 Computerized allocation of inspectors 193
10 Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process
(Order regarding submition of the inspection reports with the timeline on department website)
194
11 Fees, procedure and all list of documents that need to be provided are available on the website
(Order regarding charges for stacking of buliding matrial on public road and with site)
195
12 Legislation for approval of complete application
(This Processes merged with various services provide by PDA)
196
13 Single window system and mandate the following features without the requirement of physical visit
(This Processes merged with various services provide by PDA)
197
Planning & Development Authority - DNH
Sr. No. SRAP-2020 Reforms SRAP-2020 Reform No. Action
1 Online dashboard available in public domain which is updated regularly 37
2 Implement a GIS system to provide details about the land earmarked for industrial 43
3 GIS system provides details about available connectivity infrastructure 44
4 Uniform building code/building by-law applicable to the entire State 178
5 Uniform building code/building by-law include provisions for risk-based classification of buildings 179
6 Uniform building code/building by-law includes accreditation programs and clear responsibilities for professionals including architects and engineers 180
7 Qualifications for architects and structural engineers in the uniform building by-law applicable in State/UT 181
8 Master plans/zonal plans/land use plans for all urban areas 182
9 Stipulate that construction permits are provided within 45 days 183
10 Fees, procedure and a comprehensive list of documents including pre-construction and post-construction No Objection Certificates (NOCs), registrations and other mandatory State/UT approvals 184
11 Construction permit approval 185
12 Mandate a single, joint site inspection of Fire, Sewerage, Electricity 186
13 Checklist and Procedure for Construction Permit,
Checklist and Procedure for Grant Occupancy Certificate
189
14 190
15 Mandate that inspections (except in case of complaint-based inspections) shall be limited to the checklist 191
16 Risk Assessment of various Services of PDA 192
17 Allocation of inspectors 193
18 Mandate Online Submission of Inspection Report 194
19 F`ees, procedure and a comprehensive list of all documents of Sanction for storage of construction material 195